One Inbox: creating a new inspection

Create an inspection, add products and specifications, and plan the work for your inspectors – step by step.

You can create an inspection directly from the One Inbox. Prepare the shipment details, add the products and specifications, and plan who will carry out the inspection. Your inspectors can then pick it up in the QC One Inspector app after syncing.

Step 1: Start a new inspection

  1. Open the One Inbox and click New inspection at the top right.

  2. Select the Licensee the inspection belongs to and click Next. Check the selection even if it is already filled in.

Step 2: Fill in the details

On the New inspection page, complete the Details section:

  • Inspection point: choose the stage of the supply chain, for example Arrival or Distribution Center.

  • Inspection type: choose the kind of inspection, for example Entrance control.

  • Shipment type: select the transport method. Depending on your selection, extra fields may appear, such as Trailer for Road transport.

  • Sender and Receiver: select both organisations. Use the search in the dropdown to find them.

  • Shipper reference and Receiver reference: add references to help you find the inspection later. These fields are optional.

  • Principal: choose Shipper or Consignee.

  • ETA: enter the expected arrival date. You will check the planned inspection date separately under Planning.

Click Save & continue. The inspection is created and the Set up inspection page opens.

Inspection details with sender, receiver, principal and ETA

Step 3: Add the units and specifications

  1. Under Units, click Add unit.

  2. In Product, search for and select the product you want to inspect.

  3. In Spec version, search for and select the specification to use for that unit.

  4. Repeat Add unit for each additional unit. Use the bin button next to a row to remove a unit added by mistake.

Check both columns: the product identifies what will be inspected, and the specification determines which checks the inspector will use.

Add a unit and select its product and specification

Step 4: Plan the inspection

  1. Scroll to Planning.

  2. Check Inspector and choose the person, inspector group, All inspectors or organisation that should receive the inspection. The available choices depend on your licensee.

  3. Set the Inspection date to the day the inspection should be carried out.

  4. If needed, add a Location and Instructions for the inspector.

  5. Use High priority or Waiting for arrival when applicable.

  6. Check the details, units and planning, then click Done to return to the list.

Tip: check the inspector and date before leaving the page, even when they have already been filled in.

Planning fields and Done button

Step 5: Check the Scheduled tab

The inspection appears on the Scheduled tab. If you cannot find it, check the selected licensee, date range and other filters. You can search using the reference you entered.

The inspector needs to sync the QC One Inspector app to receive the inspection. The inspection date must fall within their inspection sync range. See Customizing Your Inspection Sync Timeframe.

Use the cloud icon beside the inspector to check the sync status. See One Inbox: the Scheduled tab.

Creating a legacy inspection

Still working with legacy (non-specification) inspections? Open the arrow next to New inspection and choose Create legacy inspection. The steps above describe the specification-based inspection flow.

Good to know

  • ETA and Inspection date are separate fields. Check both when preparing work for another day.

  • Save & continue creates the inspection. Complete its units and planning before considering it ready for the inspector.

  • Need to change the inspector or date for several scheduled inspections? Use bulk edit.